>
Zhengzhou Dongding Machinery Co.,Ltd.

180-200t/d Raw Coal Dryer Project

Time: 2024-07-27

180-200t/d Raw Coal Dryer Project 


Raw material: raw coal
Input moisture: About 35%     
Output moisture: About 18%
Capacity: 180-200T/D.  


This raw coal dryer is used to dry the raw coal from moisture content about 35% to final moisture content about 18%; the capacity of this drying system is 180-200t/d.

raw coal dryer.jpg

This full raw coal drying plant has put into production after the installation on September

raw coal drying.jpg